Agent Console
3 agents deployed · 4 in Phase 2 pipeline
3
Active Agents
All systems nominal
6
In Progress
Across 3 agents
2
In Review
Awaiting PM approval
4
Completed Today
15 total tasks tracked
TO DO
3Scan Sage 300 for new PCOs entered today
Check Sage 300 CRE for any newly entered potential change orders across all active jobs
Review MEP submittal package — Eastside Medical TI
14 documents pending review — cross-referencing Division 15 and 16 specs on ACC
Review PM sync notes — all projects
Processing this morning's PM sync notes — creating task board tickets from action items
3 tasks
IN PROGRESS
6Monitoring PCO-2024-031 — day 31
Drafting change request for owner signature — Cascadia Retail Center structural steel
Writing commitment CO for concrete sub
Cascadia Retail Center, $42,800 — generating document for team review
Reviewing structural steel shop drawings
Cross-referencing specs Section 05120 and sheets S-201/S-202 on ACC — Cascadia Retail Center
Creating submittal SUB-091 in ACC
Concrete mix design 6000 PSI — Riverside Distribution
Processing OAC meeting transcript
Cascadia Retail Center, March 4 — extracting action items and assigning to team
Reviewing owner email thread — Riverside
Owner RFI response on Riverside Distribution — flagging 3 action items
6 tasks
IN REVIEW
2Change request draft — PCO-2024-031
Cascadia Retail Center structural steel $29K — awaiting PM signature
Submittal SUB-091 — concrete mix design
Riverside Distribution 6000 PSI — ready for engineer review
2 tasks
DONE
4Generated CO document — CO-2024-028
Riverside Distribution — HVAC duct relocation ($18,200). Ready for team review
Approved roofing membrane submittal SUB-087
Cross-referenced with spec Section 07510 — Harborview Warehouse
Processed Sub Coordination meeting
Mechanical — created 4 action items, assigned to Andrew Hayes
Generated 3 commitment CO documents
Eastside Medical TI — approved COs ready for download and Sage entry
4 tasks
Agent Activity Log
CO Agent Drafting change request for PCO-2024-031 — Cascadia Retail Center, $29K
22 min agoSubmittal Agent Reviewing structural steel shop drawings — Cascadia Retail Center
45 min agoMeeting Intel Processing OAC transcript — Cascadia Retail Center, March 4
1 hr agoCO Agent Generated CO document for CO-2024-028 — Riverside Distribution — ready for download
1 hr agoSubmittal Agent Creating submittal SUB-091 in ACC — concrete mix design 6000 PSI
2 hr agoMeeting Intel Flagged 3 action items from Riverside owner email thread
2 hr agoSubmittal Agent Approved roofing membrane SUB-087 — Harborview Warehouse
3 hr agoMeeting Intel Processed Sub Coordination meeting — 4 action items created
Yesterday