Field Operations

Autodesk Construction Cloud

RFIs, submittals, daily logs, and subcontractor activity across all projects

Open RFIs

7

2 overdue

Overdue Submittals

3

past due date

Daily Log Compliance

72%

this week across portfolio

Active Subs

14

across all projects

RFI Board

RFI-147overdue24d

Foundation pier embedment depth — grid lines C-F

Riverside Distribution · Structural Engineer

RFI-148overdue22d

Loading dock concrete apron slope direction

Riverside Distribution · Civil Engineer

RFI-149open12d

Storefront glazing at curtain wall transition detail

Cascadia Retail Center · Architect

RFI-150open8d

Fire-rated partition continuation above ceiling grid

Meridian Office Park · Architect

RFI-151open5d

Medical gas outlet locations — revised room layout

Eastside Medical TI · MEP Engineer

RFI-152open3d

Roof drain routing conflict with steel joist

Harborview Warehouse · Structural Engineer

RFI-153open2d

Elevator pit waterproofing specification

Meridian Office Park · Architect

Submittal Log

SUB-089overdueDue Feb 28

Structural steel shop drawings — Phases 2-3

Cascadia Retail Center · Pacific Steel

SUB-091overdueDue Mar 1

Concrete mix design — dock area 6000 PSI

Riverside Distribution · Central Concrete

SUB-093overdueDue Mar 2

Medical gas piping — material certification

Eastside Medical TI · NW Mechanical

SUB-094pendingDue Mar 12

Curtain wall system — product data and samples

Meridian Office Park · Cascade Glass

SUB-095pendingDue Mar 15

ESFR sprinkler heads — fire suppression upgrade

Harborview Warehouse · FireGuard Systems

SUB-087approvedDue Feb 20

Roofing membrane — TPO system specification

Harborview Warehouse · NW Roofing

SUB-088approvedDue Feb 25

Elevator cab finishes — owner selection

Meridian Office Park · Otis Elevator

SUB-085returnedDue Feb 18

HVAC equipment — RTU specifications

Cascadia Retail Center · Comfort Air

Daily Log Compliance — This Week

ProjectPMLogs FiledCompliance
Meridian Office ParkMike Torres5 / 5
100%
Harborview WarehouseMike Torres4 / 5
80%
Eastside Medical TIDave Chen5 / 5
100%
Cascadia Retail CenterSarah Whitfield2 / 5
40%
Riverside DistributionSarah Whitfield2 / 5
40%

Agent Activity

Submittal Agent — Reviewed structural steel shop drawings — cross-referenced S-201/S-202 — Cascadia Retail Center

45 min ago

Submittal Agent — Created SUB-091 in ACC — concrete mix design — Riverside Distribution

1 hr ago

Meeting Intelligence Agent — Processed Sub Coordination transcript — 4 action items created

2 hrs ago

Submittal Agent — Approved roofing membrane SUB-087 — Harborview Warehouse

Yesterday
Data source: Autodesk Construction Cloud (RFIs, submittals, daily logs) · Last sync 15 min ago